article thumbnail

Grounded Boeing Max 9 Jets Could Resume Flying Within Days

Baua Electric

6 after a body panel detached from an Alaska Airlines Max 9 minutes after the flight took off from Portland, Ore., On Wednesday, the agency approved a set of inspection and maintenance procedures and said airlines could resume flying the jets once the checks were complete. leaving a gaping hole in the side of the jet.

article thumbnail

Boeing Reinstalled Panel That Later Blew Out of 737 Max Jet

Baua Electric

The request to open the plug came from employees of Spirit AeroSystems, a supplier that makes the body for the 737 Max in Wichita, Kan. After Boeing employees complied, Spirit employees who are based at Boeing’s Renton factory repaired the rivets. Boeing employees then reinstalled the door.

Wichita 52