article thumbnail

Honeywell’s UOP Methanol-to-Olefins technology selected to convert coal to high-value petrochemicals in China

Green Car Congress

Jiutai will produce 600,000 metric tons per year of ethylene and propylene at its facility in Ordos City, Inner Mongolia Province, China. which licensed the first commercial-scale installation of Honeywell’s UOP MTO methanol-to-olefins solution, which combines the UOP/Hydro MTO process and the Total Petrochemicals/UOP Olefin Cracking Process.

Coal 225
article thumbnail

Teco to begin producing E-Bus hub motors in April, May

Green Car Congress

The hub motors will be installed in electric buses in Japan, with each vehicle using eight such propulsion devices. Taiwan’s Teco Group will start producing the first batch of in-wheel (hub) electric motors in April or May, according. to the chairman C.K. Industry sources say that Teco has won orders for 85 such generators.

Motors 170
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

China is building a mammoth 8 GW solar farm

Baua Electric

It will be sited in Ordos, in northern China’s Inner Mongolia region, the Shanghai-listed company said in a stock filing. China Three Gorges Renewables will take a 56% stake, and Inner Mongolia Energy Group will control 44%. In addition to the massive solar farm, the $10.99

Solar 52
article thumbnail

China’s 3GW Gobi Desert solar farm can power 2 million households

Baua Electric

The Mengxi Blue Ocean Photovoltaic Power Station, located in Otog Front Banner, Ordos, Inner Mongolia, came online on November 5. With a massive installed capacity of 3 gigawatts (GW) and over 5.9 Plus, it’s free to use and you won’t get sales calls until you select an installer and share your phone number with them.

Solar 52
article thumbnail

This 3GW Gobi Desert solar farm can power 2 million households

Baua Electric

The Mengxi Blue Ocean Photovoltaic Power Station, located in Otog Front Banner, Ordos, Inner Mongolia, came online on November 5. With a massive installed capacity of 3 gigawatts (GW) and over 5.9 Plus, it’s free to use and you won’t get sales calls until you select an installer and share your phone number with them.

Solar 52