Remove Convert Remove Parts Remove Portland Remove Spain
article thumbnail

Siemens installing Sitras supercap-based stationary energy storage unit for TriMet light right substation

Green Car Congress

Siemens is currently installing the first Sitras SES (stationary energy storage) Energy Storage Unit with supercapacitor technology in the US on the new TriMet Portland-Milwaukie Light Rail Transit Line. mile line extension project that will connect the southeast corridor to downtown Portland, and other regions that TriMet MAX serves.

article thumbnail

Video Friday: Autonomous Car Drifting, Aerial-Aquatic Drone, and Jet-Powered Robot

Cars That Think

Half of them are in the front part and the other half are in the rear part. Our system converts raster or vector images into piecewise-continuous paths depending on stylistic choices, such as TSP art or stroke-based drawing. Ollero from GRVC Robotics Lab of Seville, Spain. There are 6 ToF distance sensors around AngGo.

Power 104