BP Plans to Deploy Subsea Oil Recovery System in 6-8 Days, Weather Permitting
Green Car Congress
MAY 3, 2010
This will mark the first time such a system will be used at this water depth (5,000 feet / 1,524 m). Equipment at the top of the system is connected to a 5,000 foot riser that will convey the hydrocarbons to the Floating Production, Storage and Offloading (FPSO) surface ship, the Deepwater Enterprise.
Let's personalize your content