Remove Connect Remove DC Remove Installation Remove Philadelphia
article thumbnail

Maxwell supplying ultracaps to ABB for hybrid version of Philadelphia rail energy recuperation system

Green Car Congress

is supplying ultracapacitors to ABB for its recent contract win to upgrade Philadelphia area rail lines. ABB will install a hybrid version of its high-efficiency ENVILINE wayside energy recovery and storage system for the Southeast Pennsylvania Transit Authority’s (SEPTA) light rail system serving the greater Philadelphia area.

article thumbnail

Electrify America to install 2,800 charging stations at workplaces and multi-unit dwellings across US

Green Car Congress

Electrify America LLC announced it will install more than 2,800 workplace and residential charging stations by June 2019 in 17 of the biggest metropolitan areas in the United States. Joining Electrify America in this initiative are SemaConnect, EV Connect and Greenlots. Earlier post.).

article thumbnail

BMW, Volkswagen and ChargePoint complete EV express charging corridors on the East and West Coasts

Green Car Congress

Electric vehicle (EV) drivers can now travel the most heavily-trafficked corridors on the East and West Coasts of the United States with the installation of 95 new DC Fast charging stations as part of the Express Charging Corridors Initiative—a collaboration of BMW of North America, Volkswagen of America, Inc.

BMW 150
article thumbnail

Electrify America releases $300M Cycle 2 national ZEV investment plan; metro charging, autonomous charging, renewable generation

Green Car Congress

Electrify America also will continue to invest in these Cycle 1 metros: Boston, Chicago, Denver, Miami, New York City, Philadelphia, Portland, Seattle and Washington, DC. Select DCFC stations also will be installed near multiunit dwellings (MUDs), expanding access to drivers who reside in apartment complexes and similar communities.

America 290
article thumbnail

What Does Battery Storage Mean for EV Drivers?

Blink Charging

And while the same analysts estimate that 60% of charging will still take place at home or work, public parking and fleet depots will require more powerful DC fast chargers for charging on-the-go. Installing a BESS can help this customer save money by drawing power from the grid during off-peak hours and storing it for use during peak hours.

article thumbnail

This Clock Made Power Grids Possible

Cars That Think

Warren quietly revolutionized power transmission by installing an electric clock in the L Street generating station of Boston’s Edison Electric Illuminating Co. In Warren’s own telling of the story , his first attempt at an electric chronometer was a crude motor that connected the gears of a clock to the Boston Edison electrical system.