Remove Building Remove Connected Remove DC Remove Lebanon
article thumbnail

ECOtality installs first DC fast charger in Tennessee

Green Car Congress

ECOtality and Cracker Barrel Old Country Store unveiled the first Blink Direct Current (DC) Fast Charger in Tennessee at the Lebanon Cracker Barrel location. This is the first of 12 Cracker Barrel locations statewide that will install DC Fast Chargers as a part of The EV Project. —Jonathan Read, CEO of ECOtality.

Tennessee 170
article thumbnail

President Obama Announces 48 Projects to Receive $2.4B in Grants for Next-Generation of Batteries and Electric Vehicles; To be Combined with $2.4B in Industry Cost-Share

Green Car Congress

Holland, MI Lebanon, OR (Entek). Production of DC bus capacitors including soft wound film and stacked film capacitors necessary for electric drive system power electronics. Outfitting of a high-volume manufacturing facility to build DC Bus Capacitors for the electric drive vehicle industry. DOE Award ($mil.). Technology.

Grant 317