Remove Battery Powered Remove Design Remove Milwaukee Remove Solar
article thumbnail

USDOT announces $84.9M through Lo-No program to expand advanced bus technologies

Green Car Congress

Topeka Metro will receive funds to purchase battery electric buses and chargers to replace diesel buses that will exceed useful life. Lextran will receive funds toward the design and construction of a covered storage area and the incremental cost of additional zero emission vehicles. Milwaukee County. Metro Transit. 2,600,000.

Purchase 170
article thumbnail

US DOT Awards $100M in Recovery Act Funds to 43 Transit Projects to Reduce Energy Consumption and Greenhouse Gas Emissions

Green Car Congress

Laredo Bus Facility Solar Canopies: Provide shade structures with integrated, grid tied photovoltaic cells to be erected on the bus storage lot at the Laredo Bus Maintenance Facility. PV canopies will produce power and reduce temperatures underneath canopies. Of that, $26.5 VIA Metropolitan Transit, Texas: $5,000,000.

Emissions 256