article thumbnail

Ford sources battery capacity and raw materials for 600K EV annual run rate by late 2023, 2M by end of 2026; adding LFP

Green Car Congress

Plus, SK On has installed capacity to support the scaling of Ford’s high-volume F-150 Lightning and E-Transits through late 2023—scaling NCM cell production beyond earlier-planned levels from its Atlanta facility and providing new battery cell capacity from its Hungary operation. Driving to more than 2 million EVs by late 2026.

Ford 221
article thumbnail

CleanFUEL USA Secures $12.9 Million from US DOE for 100+ Propane Refueling Stations

Green Car Congress

The first station will be installed in Atlanta followed by Chicago, Houston, Denver and Sacramento. In addition to installing autogas refueling stations, the project scope involves marketing campaigns to surrounding municipal, state and private fleets about autogas vehicle options (e.g.

USA 218
article thumbnail

US DOE Awards $300 Million in Clean Cities Grants to Support Alternative Fuels, Vehicles, and Infrastructure Development

Green Car Congress

The program includes the installation of 10 alternative fuel refueling sites (two B20, one Electric Recharging, and seven CNG). The project will deploy 554 alternative fuel and hybrid electric vehicles and install 153 alternative fueling and electric vehicle charging stations throughout the Chicago region. Total DOE award: $15,000,000.

article thumbnail

Flash Drive: 2023 Genesis GV70 EV AWD

Clean Fleet Report

After driving in-and-around Atlanta for several hours, we averaged a respectable 3.3 Most owners will opt to install a 240V Level 2 charger at their home that will replenish 10% to 100% in about seven hours. The driving range is affected by driving style, the drive mode and how often the temptation occurs to activate the Boost Mode.

article thumbnail

Ford will use module-less LFP batteries from CATL

Push EVs

Plus, SK On has installed capacity to support the scaling of Ford’s high-volume F-150 Lightning and E-Transits through late 2023 – scaling NCM cell production beyond earlier-planned levels from its Atlanta facility and providing new battery cell capacity from its Hungary operation. Driving to more than 2 million EVs by late 2026.

Ford 105