Remove Atlanta Remove Building Remove Connect Remove Extended Range
article thumbnail

Ford begins production of 2012 Focus Electric at Michigan Assembly, C-MAX models on deck

Green Car Congress

The 19 launch markets also include Atlanta; Austin and Houston, Texas; Boston; Chicago; Denver; Detroit; Los Angeles; San Francisco; San Diego; New York; Orlando, Fla.; A limited number of Focus Electrics will first be available in California and the New York/New Jersey areas. Phoenix and Tucson, Ariz.; Portland, Ore.; Raleigh-Durham, N.C.;

Michigan 363
article thumbnail

President Obama Announces 48 Projects to Receive $2.4B in Grants for Next-Generation of Batteries and Electric Vehicles; To be Combined with $2.4B in Industry Cost-Share

Green Car Congress

Outfitting of a high-volume manufacturing facility to build DC Bus Capacitors for the electric drive vehicle industry. Develop, analyze, and demonstrate hundreds of Chevrolet Volt Extended Range Electric Vehicles (EREVs) --125 Volt PHEVs for electric utilities and 500 Volt PHEVs to consumers. Powerex, Inc. Youngwood, PA.

Grant 317