Remove Arlington Remove Manufacturer Remove Re-Charge Remove Water
article thumbnail

ARPA-E awarding $39M to 16 projects to grow the domestic critical minerals supply chain

Green Car Congress

The projects selected projects as part of the MINER program are: University of Texas at Arlington. First, an electric potential will be applied to water to simultaneously produce acidity and alkalinity. Re-Mining Red Mud Waste for CO 2 Capture and Storage and Critical Element Recovery (RMCCS-CER) ($1,000,000).

Supplies 345
article thumbnail

DOE ARPA-E awards $156M to projects to 60 projects to accelerate innovation in clean energy technologies

Green Car Congress

Energy Plant Design The University of California, Los Angeles, will re-engineer. that produces large quantities of sugar and requires less water. manufacturing process that, if successful, has the potential to. Arlington). breakthroughs in superconducting wire manufacturing process. This will allow a. 2,206,614.

Energy 294