Remove Alternative Fuels Remove Building Remove DC Remove Taxi
article thumbnail

Roadmapping Your Airport EV Charging Installation

Blink Charging

The first step to build out comprehensive electric vehicle charging infrastructure is to select an EV charging expert that can walk airport administrators and facility managers through the process. DC fast chargers, which are more expensive to install and operate, are best used for a 30-45 quick charge in the middle of the day.

article thumbnail

Where to locate public chargers?

Electric Auto Association

It is a fact not obvious to non-electric vehicle (EV) owners that every electrical outlet (110v, 220v, or DC fast 480v) is a potential refueling spot for EVs. Installing Level 2 chargers will build goodwill and loyalty, attract new customers, retain existing customers, increase revenue per customer, and respond to demand.

DC 78
article thumbnail

Calif. Energy Commission to award more than $44M for hydrogen refueling and alternative fuel vehicle projects

Green Car Congress

In two packages of awards, the California Energy Commission approved more than $44 million to expand the hydrogen fueling infrastructure and increase the number of alter alternative fuel vehicles on the road in the state. will receive $3 million to build a 100% renewable hydrogen fueling station in Chino (San Bernardino County).

article thumbnail

Driving the VW e-Golf; strategy, assembly in Wolfsburg, Braunschweig battery plant

Green Car Congress

We are starting with optimizing our conventional drive trains—the TDI diesel engines, the TSI engines, the DSG transmission, all of those technologies have helped us to lower our fuel consumption a lot. We have different alternative fuels in our program such as CNG and LPG, we are working on some synthetic fuel.

Batteries 356