Remove 2019 Remove Battery Remove Grant Remove Smart Charger
article thumbnail

Atlanta’s MARTA orders 6 Xcelsior CHARGE 40-foot electric buses from New Flyer

Green Car Congress

announced that the Metropolitan Atlanta Rapid Transit Authority (MARTA) has awarded New Flyer with a new order for six Xcelsior CHARGE zero-emission, battery-electric forty-foot heavy-duty transit buses. The purchase is supported by federal funding from the Federal Transit Administration’s (FTA) Low or No Emission (Low-No) Grant Program.

Atlanta 321
article thumbnail

Electric car chargers to be required in all new house and office builds in England

EV Info

All chargers installed will additionally have to be ‘smart’ – allowing owners to tell their cars when to charge and up to what percentage, with the option of recharging only during times when energy demand is generally lower. How much does it cost to install an electric car charger in your house? hours, for example.

article thumbnail

Emporia’s energy management system prepares for the bidirectional EV charging future

Charged EVs

So, we developed an energy monitoring device, which we launched in the spring of 2019. And you don’t need a bidirectional charger or a battery to take advantage of that? We have smart plugs that will turn on all smart appliances. Christian: Now you have a Level 2 EV charger that integrates with your system.

Energy 119