Remove 2018 Remove Installation Remove Maintenance Remove Portland
article thumbnail

Investigators Outline Critical Questions in Boeing 737 Max 9 Incident

Baua Electric

Investigators have identified several questions as they try to get to the bottom of what caused a part of a Boeing 737 Max 9 plane to be blown out in midflight on Friday, including about how a critical component was installed. The questions also include whether Alaska Airlines, which operated the flight from Portland, Ore.,

Alaska 52
article thumbnail

The Growing List of EVmatch Partners

EV Match

EVmatch and Silicon Valley Clean Energy are working together to install charging stations at multi-family properties in Santa Clara County, California. BED offers an additional $500 per installed charger to help cover the installation costs of each station if the owner agrees to make it publicly available from 9am – 5pm.

article thumbnail

Boeing Reinstalled Panel That Later Blew Out of 737 Max Jet

Baua Electric

An internal system that tracks maintenance work at the facility, which assembles 737s, shows the request for maintenance but does not contain information about whether the door plug was inspected after it was replaced, the person said. In 2018 and 2019, two crashes of the 737 Max 8 killed 346 people. In addition to the N.T.S.B.,

Wichita 52
article thumbnail

Boeing Max 9 Jets Remain Grounded as Airlines Await Inspection Instructions

Baua Electric

The plane landed safely, but the event, on a flight from Portland, Ore., oversight, Boeing’s manufacturing process and installation or maintenance work done on the plane. to Ontario, Calif., has spooked travelers and prompted an immediate call for safety inspections on Max 9 planes with similar seat configurations.

Alaska 52