Remove 2015 Remove CO2 Remove North Dakota Remove Water
article thumbnail

DOE selects 2 projects to demonstrate feasibility of enhanced water recovery; producing usable water from CO2 storage sites

Green Car Congress

The US Department of Energy (DOE) has selected two projects that will test emerging enhanced water recovery (EWR) technologies for their potential to produce useable water from CO 2 storage sites. The two projects were competitively selected from the five Brine Extraction Storage Test (BEST) projects awarded in September 2015.

Water 150
article thumbnail

Texas Clean Energy Project signs long-term CO2 offtake agreement with Whiting Petroleum for enhanced oil recovery; 90% CO2 capture from IGCC coal polygen plant

Green Car Congress

TCEP will begin delivering CO 2 to Whiting when the plant commences operations in late 2014 or early 2015; construction is scheduled to begin at the end of this year. In oil fields such as Whiting’s, the injected CO 2 mixes with the oil that is left behind in the primary oil-well production and the secondary water-injection stage.

Coal 186