Remove 2007 Remove Audi Remove MPH Remove Re-Charge
article thumbnail

Perspective: A View Into the New GM

Green Car Congress

Fritz Henderson, GM’s President and CEO: “ We had a couple of Audi and BMW customers sit in an Equinox and say ‘this vehicle should be priced well above what it is’—Chevrolet should blow people away for what they get for their money. ”. Re-badging is a sensitive topic with the OEMs and their desire to highlight the differences among brands.

GM 262
article thumbnail

Driving the VW e-Golf; strategy, assembly in Wolfsburg, Braunschweig battery plant

Green Car Congress

Hinze is the engineer in charge of the rollout of the e-Golf and e-up!). The Golf offers the CCS charging system, enabling both AC and DC fast charging. kW charge to 100% SOC will take about 8 hours; a DC fast charge to 80% SOC will take about 30 minutes. The e-Golf reaches a speed of 60 km/h (37 mph) within 4.2

Batteries 356