Remove Grid Remove Portland Remove Spain Remove Store
article thumbnail

Siemens installing Sitras supercap-based stationary energy storage unit for TriMet light right substation

Green Car Congress

Siemens is currently installing the first Sitras SES (stationary energy storage) Energy Storage Unit with supercapacitor technology in the US on the new TriMet Portland-Milwaukie Light Rail Transit Line. The 27 retrofitted vehicles are being paired with non-capacitor equipped vehicles so that stored energy can be used by both vehicles.