Remove Federal Grant Remove Grant Remove Grid Remove Michigan
article thumbnail

A123 Systems 8K filing says substantial doubt about its ability to continue as a going concern; status of grants and incentives

Green Car Congress

million to replace battery modules and packs that may contain defective prismatic cells produced at A123’s Livonia, Michigan manufacturing facility. million related to inventory produced at its Michigan facilities that may be defective. A123 Systems has been the recipient of a number of state and federal grants and tax incentives.

Grant 299
article thumbnail

Sodium batteries from Michigan to challenge lithium’s grip – ET Auto

Baua Electric

Natron’s facility in Holland, Michigan, is funded in part by a nearly USD 20 million federal grant. For some uses, such as the high-capacity batteries that back up solar power plants or support the electric grid, physical size doesn’t matter much. Other companies — including HiNa Battery Technology Co. and Amazon.com Inc.,

Sodium 52
article thumbnail

Chrysler unveils new electric minivan for the US Postal Service

Tony Karrer Delicious EVdriven

Department of Energys Transportation Electrification stimulus program for a federal grant that would enable a nationwide demonstration fleet with the United States Postal Service (USPS) * Potential partnership with USPS to include infrastructure support from ConEd, Duke Energy, DTE Energy and Electric Power Research Institute (EPRI) Washington, D.C.,

Minivan 46