Remove Exhaust Remove Lithium Sulfur Remove Recharge Remove Waste
article thumbnail

DOE announces $26.6M SBIR/STTR FY15 Phase 1 Release 2 awards; fuel cells, batteries, power electronics and efficient combustion engines

Green Car Congress

This quality control device will help to drive down the costs of fuel cells by reducing waste and improving the process efficiency of roll-to-roll manufacturing of polymer electrolyte membranes. High Loading Lithium-Ion Electrode Architecture for Low Cost Electric Vehicle Batteries Ballast Energy, Inc. 149,871.44. 149,999.70.

Li-ion 150