Remove Design Remove Puerto Rico Remove Renewable Remove Tax
article thumbnail

Where to Start with EV Charging for Convenience Stores & Truck Stops

Blink Charging

For example, if your truck stop or c-store is located within a designated Alternative Fuel Corridor (AFC) and you want to take advantage of the Department of Transportation’s National Electric Vehicle Infrastructure program (NEVI), then you would need to install a bank of at least four 150kW DC fast chargers DCFCs to receive that funding.

Store 95
article thumbnail

Blink’s 2023 Year in Review

Blink Charging

Then in June, we announced the final design of our newest 240kW DC Fast Charger , which was teased at CES 2023. Blink Family of Products Designed with the future in mind, Blink offers a full range of solutions for Level 2 and DC fast charging.

article thumbnail

Three Major Sources of Funding for EV Charging at Convenience Stores and Truck Stops

Blink Charging

. $5 billion is allocated for the NEVI program, which will be used by the states for the establishment of an interconnected national network of direct current fast chargers (DCFCs) along designated Alternative Fuel Corridors. Renewable energy generation, energy storage, and upgrades of existing infrastructure also qualify for funding.

Store 52