article thumbnail

Major truck OEMs form PACT to advocate for EV infrastructure development – Charged EVs

Baua Electric

The pursuit of contradictory goals is a basic fact of human nature, and the commercial truck industry is no exception. The latest DOE data indicates that at the moment, there are only 9 public DC fast charging stations capable of serving Class 6-8 trucks in the US.

article thumbnail

Tech: Another Day, Another Battery Breakthrough

Clean Fleet Report

The company is already working on scaling up the size of the battery with multi-layer cells on the path to building a commercial-size battery pack. The tests were conducted “on commercially relevant sized single-layer prototype battery cells under real-world automotive test conditions at room and high temperatures (25°C and 45°C), 3.4

article thumbnail

Drive Electric Submission on the EECA Consultation Document, ‘Developing a Short Term Roadmap’ for the Public Electric Vehicle Charging Network.

Drive Electric

It is also essential that charging infrastructure is rolled out in an integrated way with urban planning and development, commercial developments and future public transport investment. Hydrogen Fuel Cell powered DC Fast Chargers). We have produced a couple of relevant white papers.