Remove Boston Remove DC Remove Installation Remove Philadelphia
article thumbnail

Electrify America to install 2,800 charging stations at workplaces and multi-unit dwellings across US

Green Car Congress

Electrify America LLC announced it will install more than 2,800 workplace and residential charging stations by June 2019 in 17 of the biggest metropolitan areas in the United States. The companies have committed to install 35% of all multi-family and workplace sites in California in designated low-income or disadvantaged community areas.

article thumbnail

BMW i and EVgo expanding ChargeNow DC Fast program; 500 more fast chargers in US; no-cost DC and Level 2 for BMW i3 drivers

Green Car Congress

At the Los Angeles Auto Show, BMW of North America announced, in cooperation with NRG EVgo, the expansion of the ChargeNow DC Fast program. ChargeNow DC Fast also includes two years of no-cost charging for qualifying BMW i3 drivers in those areas. Earlier post.) —Rob Healey, Head of EV Infrastructure for BMW of North America.

DC 150
article thumbnail

Electrify America releases $300M Cycle 2 national ZEV investment plan; metro charging, autonomous charging, renewable generation

Green Car Congress

Electrify America also will continue to invest in these Cycle 1 metros: Boston, Chicago, Denver, Miami, New York City, Philadelphia, Portland, Seattle and Washington, DC. Metro DCFC stations will be placed in retail locations and are intended to serve EV drivers in their daily fueling needs.

America 290
article thumbnail

BMW, Volkswagen and ChargePoint complete EV express charging corridors on the East and West Coasts

Green Car Congress

Electric vehicle (EV) drivers can now travel the most heavily-trafficked corridors on the East and West Coasts of the United States with the installation of 95 new DC Fast charging stations as part of the Express Charging Corridors Initiative—a collaboration of BMW of North America, Volkswagen of America, Inc.

BMW 150
article thumbnail

First $300M tranche of VW National ZEV investment targets charging infrastructure; 150kW+ fast charging on highway network

Green Car Congress

Chicago, Portland, Boston, Seattle, Philadelphia, Denver, Houston, Miami, and Raleigh—and several highway corridors. Installing charging infrastructure (approximately $250 million); Public Education initiatives (approximately $25 million); and. First tranche. personnel, other business expenses).

Charging 150
article thumbnail

EIA: major utilities continue to increase spending on US electric distribution systems

Green Car Congress

Electric distribution spending is affected by the number of customers served, the amount of electricity sold, the number of miles of electric distribution wire installed (line miles), and the maximum amount of load on the lines at one time (peak load).

article thumbnail

This Clock Made Power Grids Possible

Cars That Think

Warren quietly revolutionized power transmission by installing an electric clock in the L Street generating station of Boston’s Edison Electric Illuminating Co. Henry Ellis Warren was born in Boston on 21 May 1872, a decade before Edison’s Pearl Street Station went online, in New York City, ushering in the dawn of the electric age.