Remove Arkansas Remove Gas-Electric Remove Renewable Remove Wind
article thumbnail

The US’s largest battery-grade lithium refinery will be in Oklahoma

Baua Electric

Muskogee also has a skilled workforce trained in oil and gas engineering. It will use Port Muskogee on the McClellan-Kerr Arkansas River Navigation System to ship lithium brine water to the refinery, where it will derive the lithium, and then use the same inland waterway system to ship battery-grade lithium out.

article thumbnail

AEP Signs on as Corporate Sponsor of Pickens’ Energy Plan

Green Car Congress

American Electric Power has signed on as a corporate sponsor of The Pickens Plan, proposed by oil and gas industry veteran T. Extra-high voltage transmission is necessary to transport renewable energy from where it is most viable to the nation’s population centers. Boone Pickens. Morris, AEP chairman, president and CEO.

article thumbnail

US DOE Selects 43 Projects for $92M in ARPA-E Funding; 3 on Automotive Power Electronics

Green Car Congress

The awards in this tranche focus on power electronics, grid-scale energy storage, and building efficiency; of the 43, three are categorized specifically for the automotive market—power electronics projects led by HRL Laboratories, LLC; Arkansas Power Electronics International, Inc.; Agile Delivery of Electrical Power Technology (ADEPT).

Power 225