Remove Affordable Remove Arlington Remove Power Grid Remove Waste
article thumbnail

DOE ARPA-E awards $156M to projects to 60 projects to accelerate innovation in clean energy technologies

Green Car Congress

wasted energy in plants into energy-dense fuel molecules. Arlington). Robust Adaptive Topology Control (RATC) Historically, the electric grid was designed to be passive, causing electric power to flow along the path of least. power grid. technology will enhance grid operations through improved.

Energy 294