Remove 2019 Remove Alaska Remove Maintenance Remove Plug
article thumbnail

Boeing Reinstalled Panel That Later Blew Out of 737 Max Jet

Baua Electric

Nearly three weeks after a hole blew open on a Boeing 737 Max 9 during an Alaska Airlines flight, terrifying passengers, new details about the jet’s production are intensifying scrutiny of Boeing’s quality-control practices. The door plug is placed where an emergency exit door would be if a jet had more seats.

Wichita 52
article thumbnail

Investigators Outline Critical Questions in Boeing 737 Max 9 Incident

Baua Electric

The questions also include whether Alaska Airlines, which operated the flight from Portland, Ore., How was this door plug installed or who installed it?” United Airlines said on Monday afternoon that it had found some loose bolts in door plugs on its Max 9 planes during preliminary inspections that began over the weekend.

Alaska 52
article thumbnail

Boeing Max 9 Jets Remain Grounded as Airlines Await Inspection Instructions

Baua Electric

No one was seriously injured in the episode on an Alaska Airlines flight on Friday night in which a portion of a Max 9 fuselage blew out in midair, exposing passengers to howling wind. In the meantime, Alaska, United and other carriers said they had parked all their Max 9 planes, despite stating on Saturday that some were deemed safe to fly.

Alaska 52
article thumbnail

Grounded Boeing Max 9 Jets Could Resume Flying Within Days

Baua Electric

6 after a body panel detached from an Alaska Airlines Max 9 minutes after the flight took off from Portland, Ore., On Wednesday, the agency approved a set of inspection and maintenance procedures and said airlines could resume flying the jets once the checks were complete. leaving a gaping hole in the side of the jet.