article thumbnail

Feds Offer Free Chargers

Revenge of the Electric Car

A new Federal Grant will enable many electric vehicle early adopters to get their chargers for free. (A Fully funded, the ChargePoint America program would cost $37 million, with some of the shortfall for the actual station installations being addressed, the organizers hope, through state and local grants.&#. A $2,000 value!).

San Jose 127
article thumbnail

8 Reasons Government Grants Should Include Funding for Level 1 Charging Infrastructure

EV Adoption

PHEVs: Plug-in hybrid electric vehicles (PHEVs) currently comprise nearly 37% of all EVs sold in the US since 2011. But for those cars parked all-day or all night, a 120 volt outlet will often be the most cost-effective solution that also provides enough range for an average driver’s daily needs.

Grant 136
article thumbnail

Freightliner Custom Chassis and Morgan Olson Introduce Next Generation Vehicle for FCCC All-Electric Walk-In Van

Green Car Congress

Introduced at the Hybrid Truck Users Forum (HTUF), the MT-EV WIV features a lightweight, aerodynamic design for improved efficiency. The all-electric chassis also was initiated before stimulus money and federal grants were available for alternative-fuel transportation projects. Earlier post.)

article thumbnail

Freightliner Custom Chassis Corporations All-Electric Walk-In Van Chassis Debuts at NTEA Work Truck Show; Enova Drive System, Tesla Battery Pack

Green Car Congress

The all-electric MT-45 chassis is expected to go into full production during the first quarter of 2011 and will undergo testing with major US pickup and delivery fleets. FCCC initiated our all-electric project well before stimulus money and federal grants were available for alternative-power transportation projects.