Remove Charging Remove Electrical Remove Grant Remove Memphis
article thumbnail

Waffle House is getting NEVI DC fast chargers in Tennessee

Baua Electric

Photo: Waffle House EV charging company EnviroSpark is installing National Electric Vehicle Infrastructure (NEVI) program DC fast chargers at Waffle House in Lakeland, Tennessee. The NEVI Formula program requires EV charging stations to be available every 50 miles and within one travel mile of the Alternative Fuel Corridor.

article thumbnail

Axion supplying PbC batteries to Norfolk Southern for all-battery switcher and working on line-haul hybrid locomotives; micro-hybrid and stationary expansion

Green Car Congress

The battery-electric NS-999, “under the long hood”. This larger, more powerful unit will require approximately twice the number of batteries as contained in the electric yard switcher. They determined that the problem was that the lead-acid batteries were getting out of synch, in terms of charge level. Source: NS. Earlier post.)

Lead Acid 225