Driving the VW e-Golf; strategy, assembly in Wolfsburg, Braunschweig battery plant
Green Car Congress
JULY 21, 2014
Hinze is the engineer in charge of the rollout of the e-Golf and e-up!). The Golf offers the CCS charging system, enabling both AC and DC fast charging. kW charge to 100% SOC will take about 8 hours; a DC fast charge to 80% SOC will take about 30 minutes. The e-Golf then re-enters the main assembly flow.
Let's personalize your content