Remove Building Remove Power Grid Remove Stimulus Remove Waste
article thumbnail

Smart Meters and Electric Cars

Revenge of the Electric Car

While the timing of charging can be handled through the use of these smart meters, this does not preclude the need for upgrading the grid, a project that will save massive numbers of kWh that are currently being wasted due to the incredibly old and cobbled together grid we’ve got now. Edison’s answer: new meters.

article thumbnail

Electric Cars and a Smarter Grid - Green Inc. Blog - NYTimes.com

Tony Karrer Delicious EVdriven

The Next ‘Better Place’ Is Australia New Subsidies for Electric Cars in Britain Tesla Motors to Build Battery Packs for Other Car Makers Previous post Group Says European Cap-and-Trade System Reduced Emissions Next post Cutting Costs With Solar Walls From 1 to 25 of 29 Comments 1 2 Next » 1.

Grid 47