Remove Downsizing Remove Re-Charge Remove Texas Remove Water
article thumbnail

EV ute overload: The electric pickups coming soon

EV Central

Being built at a new Gigafactory in Austin Texas, first US Cybertruck deliveries are scheduled for production late in 2023, having been delayed on multiple occasions. It has now re-established it as an electrified sub-brand of GMC. A sizeable 142kWh battery pack was claimed to cover about 320km between charges.

F-150 98