article thumbnail

PowerCell signs MoU with ABB Power Grids on stationary fuel cell power solutions

Green Car Congress

PowerCell Sweden AB has signed a memorandum of understanding with ABB Power Grids regarding a collaboration around fuel cell based zero emissions stationary power solutions. The MoU with ABB Power Grids is an important step and a great contribution to our increased efforts within the stationary segment.

article thumbnail

Rolls-Royce to supply 60 MWh battery storage to Semper Power to stabilize the Dutch power grid

Green Car Congress

Semper Power develops and operates energy storage systems for wind and solar farm developers, distribution grid operators and industrial customers. When fully charged, the system has the capacity to supply 8,000 households with electrical energy for an entire day.

Grid 221
article thumbnail

Will this ‘ocean battery’ buried in the seabed be an offshore wind game changer?

Electrek

Offshore wind power needs energy storage and power regulation, and Ocean Grazer has invented an offshore energy storage system that will sit at the bottom of the sea and manage the flow of electricity through the power grid. appeared first on Electrek.

Las Vegas 138
article thumbnail

Wind-to-Hydrogen Tech Goes to Sea

Cars That Think

Wind and solar parks produce a large portion of their energy. Then, as now, wind farms are operating off the world’s coasts—but not all of these offshore sites are connected to the mainland via underwater power cables. Some of the wind farms instead sit in clusters more than 100 kilometers out at sea.

Wind 90
article thumbnail

Hydro-Québec and Sony forming JV to develop large-scale Li-ion energy storage system for power grids

Green Car Congress

Hydro-Québec and Sony Corporation will establish a joint venture to research and develop a large-scale energy storage system for power grids. Furthermore, the energy storage system for such power supplies must be highly safe and reliable due to the need for an efficient and stable source of high capacity power.

article thumbnail

A huge new 1.2 GW offshore wind farm is headed to New England

Baua Electric

Photo: Avangrid Vineyard Offshore, which developed Vineyard Wind 1, has submitted a proposal for a 1.2 gigawatt (GW) offshore wind farm to three New England states. GW of offshore wind capacity. Vineyard Wind 2 was proposed to each state and to the three states together under the New England solicitation process.

Wind 52
article thumbnail

Virginia could make almost $5B from this 3.5 GW offshore wind farm

Baua Electric

gigawatt (GW) Kitty Hawk Wind could deliver around $5 billion in economic impact across Virginia – here’s where the project stands. The 180-turbine Kitty Hawk Wind is an offshore wind project proposed in federal waters over 36 miles from Virginia Beach. Kitty Hawk Wind would deliver about $4.8 Get started here. –