Remove Batteries Remove Supplies Remove Texas Remove Wind
article thumbnail

Texas installs another big solar + battery storage project

Baua Electric

Photo: Enel North America Power-hungry Texas needs solar and battery storage to help meet demand and balance the grid, so its largest utility-scale storage operator is delivering. The project pairs a 186-megawatt (MW) solar farm with 115 MW/169 MWh battery storage. GW of wind and solar plus over 1 GW of grid-scale storage.

Texas 52
article thumbnail

BP selects Tesla batteries for pilot storage project at US wind farm

Green Car Congress

BP Wind Energy, through its wholly-owned subsidiary Rolling Thunder I Power Partners LLC, has signed a purchase agreement to install a high-storage battery at its Titan 1 Wind Farm in South Dakota. Situated on 7,500 acres in Hand County, Titan 1 Wind Farm is wholly owned and operated by BP Wind Energy.

Wind 150
article thumbnail

Tesla heads are rolling over critical projects at Gigafactory Texas

Baua Electric

While Tesla is conducting broader layoffs, Electrek is learning that heads are rolling at Tesla over specific critical projects at Gigafactory Texas. However, Electrek is learning that Tesla is also using this round of layoffs to clean house on some projects in Austin, Texas. Musk also pushed for other changes at Gigafactory Texas.

Texas 52
article thumbnail

The size of Washington State’s largest wind farm just got cut by 50%

Baua Electric

Washington State’s energy board cut the size of what would have been the state’s largest wind farm in half yesterday – here’s why. Wind farm controversy in Washington State The $1.7 billion, 1,150-megawatt (MW) Horse Heaven Clean Energy Center combines wind, solar, and battery storage.

article thumbnail

Tesla is officially an energy provider in Texas

Teslarati

Tesla has officially entered the Texas market as an energy provider, new documents from the Texas Public Utility Commission state. In August, Tesla Energy had officially filed an application with the Texas Public Utility Commission to sell power in the Lone Star State. The story was initially reported by Gizmodo.

Texas 145
article thumbnail

Valence Technology Supplying Batteries for Peak Shaving for Texas Smart Grid Project

Green Car Congress

Li-ion manufacturer Valence Technology has been selected as the preferred residential/community battery technology provider for the “Smart Grid Community of the Future,” the first smart-grid solar-powered residential development in Texas, the Houston-area master planned community of Discovery at Spring Trails.

Grid 186
article thumbnail

US battery storage capacity to nearly double in 2024: EIA – ET Auto

Baua Electric

The Electric Reliability Council of Texas in December said it expects around 4.46 GW of battery storage to be available by July 2024. US battery storage capacity could increase by 89% by the end of 2024 if all planned energy storage systems are brought online at the targeted time, the Energy Information Administration said on Tuesday.

Auto 52