Remove Commercial Remove Denmark Remove Hydrogen Remove Water
article thumbnail

Hysata closes $42.5M AUD Series A to commercialize capillary-fed electrolysis

Green Car Congress

Australia-based Hysata, which is commercializing capillary-fed electrolysis technology developed at the University of Wollongong ( earlier post ) has closed its oversubscribed Series A funding round of $42.5 The porous, hydrophilic separator sustains the flow rate required for water electrolysis. million AUD (US$30 million).

article thumbnail

Topsoe to build world’s largest SOEC electrolyzer production facility; 500 MW scalable to 5 GW; focusing on Power-to-X

Green Car Congress

The new electrolyzer production plant, which will be constructed in Herning, Denmark, will be operational by 2024 and have an annual capacity of 500 MW with scalability up to 5 GW, making it one of the first industrial-scale plants of its kind. This is accomplished by three components: an anode, a cathode, and an electrolyte.

Power 418
article thumbnail

EU project HyFlexFuel converted sewage sludge and other biomasses into kerosene by hydrothermal liquefaction (HTL); SAF

Green Car Congress

The EU-funded research project HyFlexFuel recently successfully produced biocrudes via hydrothermal liquefaction (HTL) from a variety of biomasses, including sewage sludge, food waste, manure, wheat straw, corn stover, pine sawdust, miscanthus and microalgae in a pilot-scale continuous HTL plant at Aarhus University (Denmark).

Convert 418
article thumbnail

Ørsted assumes full ownership and takes final investment decision on FlagshipONE, largest green e-methanol project in Europe

Green Car Congress

FlagshipONE will be Ørsted’s first commercial-scale Power-to-X facility and is an important step towards Ørsted’s ambition of taking a leading position in renewable hydrogen and green fuels. In addition, FlagshipONE will use steam, process water, and cooling water from Hörneborgsverket. Earlier post.)

Green 221
article thumbnail

Wind-to-Hydrogen Tech Goes to Sea

Cars That Think

They are highly automated production islands that directly convert wind energy to hydrogen, with a few of them processing the gas into fuels and other goods. In these clusters, the wind turbines are integrated with electrolyzers that generate hydrogen from desalinated seawater. US $5 PER KILOGRAM Cost of green hydrogen today.

Wind 94
article thumbnail

Topsoe and First Ammonia sign 5GW electrolyzer agreement for green ammonia

Green Car Congress

Topsoe’s SOEC manufacturing plant is to be built in Herning, Denmark, and has recently received FID from the board. These projects will be the world’s first commercial-scale, green ammonia production facilities with operation planned for 2025. At 5GW, this would be the largest electrolyzer reservation of any type.

Green 186
article thumbnail

Topsoe enters agreement with Steeper Energy to introduce complete waste-to-biofuel solution

Green Car Congress

The agreement combines Topsoe’s technologies in renewable fuels and hydrogen production as well as decades of experience in engineering with Steeper’s proprietary Hydrofaction technology and industry know-how. With this agreement, the parties are working towards the first commercial scale deployment of Hydrofaction technology.

Waste 293