Remove News Remove Oklahoma Remove Personal Remove Solar
article thumbnail

The US’s largest battery-grade lithium refinery will be in Oklahoma

Baua Electric

Stardust Power , a lithium refiner supplying the EV sector, is going to build the US’s largest battery-grade lithium refinery in Oklahoma. The refinery will be in Southside Industrial Park in Muskogee, Oklahoma, southeast of Tulsa, and is expected to be capable of producing up to 50,000 metric tonnes of battery-grade lithium annually.

article thumbnail

A 147.5 MW wind farm is breaking ground in Oklahoma – a first for Avangrid

Baua Electric

Photo: Avangrid Orange, Connecticut-based clean energy giant Avangrid just made its first leap into Oklahoma with a new wind farm project. Avangrid, which is part of the Iberdrola Group, is setting up the Pontotoc Wind project in Pontotoc County, southeast of Oklahoma City. Get started here. – The post A 147.5

article thumbnail

North America just got its first recycled Li-ion battery materials plant

Baua Electric

Within an existing recycling facility in Atoka, Oklahoma, the plant will produce sustainable, battery-grade cathode precursor, lithium, and anode materials – closing the EV recycling loop with the production done all in one plant. Get started here. –ad* ad* FTC: We use income earning auto affiliate links.

Li-ion 52
article thumbnail

Panasonic cools on idea for third US plant for Tesla batteries

Baua Electric

A third location was expected to be announced soon , and with it thousands of new jobs and the company pledging to raise its production capacity to 200 GWh by early 2031 from its current limit of 50 GWh. In December, the Japanese-owned electronics company turned down nearly $700 million in state incentives to build in Oklahoma.

IDEA 52
article thumbnail

Advocating electric in the heartland

Electric Auto Association

Members of Mid-America Electric Auto Association (MAEAA) , straddling KansasCity and stretching into Missouri, Kansas, and Oklahoma, have been active in challenging two pieces of legislation in the Kansas State Legislature, including a 2019 ordinance to level a demand charge on the state’s solar-powered homes.

Kansas 98
article thumbnail

3 of Oklahoma’s first NEVI EV charging stations will be Tesla Superchargers

Baua Electric

Oklahoma approved more than $8 million in federal funds for Tesla and two other companies to build DC fast chargers along its interstates. Tesla will install three Superchargers, and they’ll be located at the I-44 exit 240 in Catoosa, the I-40 exit 240B in Henryetta, and the I-44 exit 125B in Oklahoma City. Get started here. –

article thumbnail

Smart-grid project matches wind to electric cars | Green Tech - CNET News

Tony Karrer Delicious EVdriven

Smart-grid technologies are not required to make larger use of wind and solar power but they can make them less expensive, Schurr said. Getting a handle on power supply and demand in real time helps address the variable nature of wind and solar power, he said. He started at CNET News in 2002, covering IT and Web development.

Wind 34