Remove industries coatings-and-linings-pipelines
article thumbnail

Rystad Energy expects strong growth in hydrogen pipelines through 2035

Green Car Congress

Independent research and business intelligence company Rystad Energy estimates that there are about 91 planned hydrogen pipeline projects in the world, totaling 30,300 kilometers and due to come online by around 2035. Hydrogen pipelines are already used to supply industrial hubs (at petrochemical plants for example).

Hydrogen 531
article thumbnail

ARPA-E awarding $33M to 10 projects for natural gas pipeline retrofitting: REPAIR

Green Car Congress

The US Department of Energy announced $33 million in funding for 10 projects as part of the Advanced Research Projects Agency-Energy’s (ARPA-E) Rapid Encapsulation of Pipelines Avoiding Intensive Replacement (REPAIR) program. More than 60,000 miles of cast iron and bare steel gas distribution pipelines are still in service.

Gas 297
article thumbnail

Johnson Matthey to build CCM plant in China for PEM fuel cells and electrolyzers

Green Car Congress

JM and the Shanghai Jiading District plan to build a new catalyst-coated membrane (CCM) production facility, providing CCM production capability for multiple proton exchange membrane (PEM) fuel cell applications and PEM electrolyzers. It will have potential to expand further in line with customer demand.

China 195
article thumbnail

MIT researchers develop surface coatings to inhibit buildup of methane hydrates that can block deep-sea oil and gas pipelines

Green Car Congress

Clathrate hydrate formation and subsequent plugging of deep-sea oil and gas pipelines represent a significant bottleneck for deep-sea oil and gas operations. The MIT team’s new method would instead use passive coatings on the insides of the pipes that are designed to prevent the hydrates from adhering.

MIT 225
article thumbnail

We visited the OLA Future Factory: Electric Scooter Manufacturing

Plug In India

Maybe this is going to be the future of the BPO industry. In contrast, the production constraint in the two wheeler industry, is only low demand. It was 1400 hours by the time we had covered the 120 km to the Ola Future factory, in the Sipcot industrial area at Pochampally, in district Krishnagiri. Currently in WFH mode.

Future 59