Remove Batteries Remove Connected Remove Installation Remove Portland
article thumbnail

TriMet puts first Xcelsior CHARGE electric bus into operation; powered by Portland General Electric renewable energy

Green Car Congress

congratulated the Tri-County Metropolitan Transportation District of Oregon (TriMet) as it welcomed its first battery-electric Xcelsior CHARGE transit bus. New Flyer previously reported the order for five forty-foot battery-electric Xcelsior CHARGE transit buses in September 2017. New Flyer of America Inc.

Portland 246
article thumbnail

BMW’s ReachNow installing Light & Charge locations in Seattle; 100 chargers at 20 new public sites

Green Car Congress

ReachNow, the mobility services division of the BMW Group, Woodland Park Zoo, and the City of Seattle celebrated the successful installation of the first of 20 Light & Charge electric vehicle (EV) charging locations that will more than double the number of Fast Chargers publicly available in Seattle. million investment by the BMW Group.

Seattle 247
article thumbnail

Electrify America to install 2,800 charging stations at workplaces and multi-unit dwellings across US

Green Car Congress

Electrify America LLC announced it will install more than 2,800 workplace and residential charging stations by June 2019 in 17 of the biggest metropolitan areas in the United States. Joining Electrify America in this initiative are SemaConnect, EV Connect and Greenlots. Earlier post.).

article thumbnail

Electrify America releases $300M Cycle 2 national ZEV investment plan; metro charging, autonomous charging, renewable generation

Green Car Congress

Electrify America also will continue to invest in these Cycle 1 metros: Boston, Chicago, Denver, Miami, New York City, Philadelphia, Portland, Seattle and Washington, DC. These metro areas are expected to account for more than 50% of expected battery electric vehicles (BEVs) in operation outside California through 2022 (Navigant, 2017).

America 290
article thumbnail

Daimler Trucks E-Mobility Group starts global initiative for electric-truck charging infrastructure

Green Car Congress

The E-Mobility Group of Daimler Trucks & Buses is launching a worldwide initiative to establish a charging infrastructure for battery-electric trucks. The initial focus is on charging stations installed at the depots of truck customers. —Gesa Reimelt, Head of E-Mobility Group Daimler Trucks & Buses.

Global 414
article thumbnail

I-5 electric truck charging sites mapped out by electric utilities; West Coast Clean Transit Corridor

Green Car Congress

The first phase would involve installing 27 charging sites along I-5 at 50-mile intervals for medium-duty electric vehicles, such as delivery vans, by 2025. An additional 41 sites on other highways that connect to I-5 are being proposed for electrification. HDR completed the study. Proposed charging site locations.

Clean 394
article thumbnail

finally connected

DIY Electric Car

I do have to hand it to Jon at Portland Manufacturing, he did a great job fabricating this connector it fit like a glove, and after assembling the motor and trans. m ready to install it in electric red this weekend that should conclude phase 2 ( the mechanical refit) and I should be able to blaze through the electrical, and battery phase.

Connect 100