article thumbnail

The world’s longest onshore wind turbine blade makes its debut

Baua Electric

The SY1310A is 430 feet (131 meters) long and rolled off the assembly line on January 21 at SANY’s zero-carbon, smart industrial park in Bayannur, Inner Mongolia. ad* FTC: We use income earning auto affiliate links. But making something this massive was about more than just scaling up. Get started here. –ad*

Wind 52
article thumbnail

Lotus Emeya completes rigorous three year testing program ahead of deliveries this year [Video]

Baua Electric

Source: Lotus Cars FTC: We use income earning auto affiliate links. The post Lotus Emeya completes rigorous three year testing program ahead of deliveries this year [Video] appeared first on Bauaelectric Auto News. Hotter environments tested the hyper-GT’s capabilities at temperatures as high as 40℃ (104℉).

article thumbnail

Chinas Largest Euro-5 Diesel Engine Plant Comes Online; 300,000 Units in Phase 1, 1M Units Targeted

Green Car Congress

CCTV reports that the Haw Tai Motor Plant, China’s largest Euro-5 diesel engine plant, has gone into production in Inner Mongolia. It’s China’s first clean diesel engine for autos. And could reduce energy consumption by a quarter, compared with gasoline engines of the same size.

Diesel 186
article thumbnail

Micro-components in EVs: small dimensions and tight tolerances (Whitepaper) – Charged EVs

Baua Electric

DOWNLOAD The post Micro-components in EVs: small dimensions and tight tolerances (Whitepaper) – Charged EVs appeared first on Bauaelectric Auto News. I acknowledge that I agree to the Terms of Use and the Privacy Policy. reCAPTCHA If you are human, leave this field blank.