article thumbnail

Here’s where Virginia is installing its first 18 NEVI EV chargers

Baua Electric

Photo: Electrify America Virginia is handing out $11.295 million in federal grants to install 18 NEVI-compliant EV chargers – here’s where they’re going. This week, the Virginia Department of Transportation (DOT) announced the first round of National Electric Vehicle Infrastructure (NEVI) federal grant winners.

article thumbnail

Waffle House is getting NEVI DC fast chargers in Tennessee

Baua Electric

Photo: Waffle House EV charging company EnviroSpark is installing National Electric Vehicle Infrastructure (NEVI) program DC fast chargers at Waffle House in Lakeland, Tennessee. The NEVI Formula program requires EV charging stations to be available every 50 miles and within one travel mile of the Alternative Fuel Corridor.

article thumbnail

8 Reasons Government Grants Should Include Funding for Level 1 Charging Infrastructure

EV Adoption

As we wait for Congress to fully return from their recess and vote on various legislation, I continue to be extremely concerned about how as much as $10 billion in federal government grants will be be spent on EV charging infrastructure. EV charging infrastructure is incredibly expensive.

Grant 136
article thumbnail

King County Metro putting Proterra electric buses into service

Green Car Congress

The routes, which also serve the Bellevue Transit Center, start and end at the Eastgate Park-and-Ride, where the battery charging station is located. The 38-seat prototype buses have a composite body and can travel 23 miles or more between charges. Batteries take 10 minutes or less to fast charge. million federal grant.

article thumbnail

4,400 Chevrolet Volt Owners to be Eligible for Free Home 240V Charging Stations

Green Car Congress

GM announced that the first buyers of the Chevrolet Volt electric vehicle with extended-range capability will be eligible for one of 4,400 free home charging stations. The program will provide Volt owners with a 240-volt charge station from either ECOtality, Inc. or Coulomb Technologies.

Volt 218
article thumbnail

Proterra introduces 35-foot electric bus

Green Car Congress

The Proterra TerraFlex Energy Systems provides customers with the ability to choose between 53 kWh to 321 kWh of energy storage, and the option to charge on-route or in-depot. TerraVolt FC fast charge options allows for maximum run time with minimum dwell time.

article thumbnail

California state fleet reduces petroleum consumption 13% compared to 2003

Green Car Congress

Key to this reduction has been the development and implementation of a plan that has improved the State fleet’s overall use of alternative fuels, the reduction of unneeded fleet vehicles, and reducing unnecessary vehicle miles traveled. As of March 2012, all 24 electric charging stations have been installed and are in service.

2003 257