Remove Oregon Remove Recharge Remove Stimulus Remove Washington
article thumbnail

Proterra introduces 35-foot electric bus

Green Car Congress

This system can be recharged on-route in less than ten minutes at a 500kW charge rate. As a result, Washington State transit agencies and members of the Oregon Cooperative Purchasing Program (ORCPP) can now bypass future RFPs to purchase Proterra’s Catalyst through the region’s new innovative Master Contracts Usage Agreement (MCUA).

article thumbnail

Coming Soon – The Electric City

Revenge of the Electric Car

Several thousand Leafs made in Japan will be delivered to metropolitan areas in California, Arizona, Washington state, Oregon and Tennessee. And in Oregon, an advisory group is working on charging stations and related issues.

article thumbnail

Electric-Car Fans Rally Around the Volt - Green Inc. Blog - NYTimes.com

Tony Karrer Delicious EVdriven

Bob Lutz’s Latest Volt Test Drive Sprinting for Green Stimulus Dollars New Subsidies for Electric Cars in Britain Electric Car Makers: Oregon Wants You G.M. The fuel engine on the Volt is used to run the generator to recharge the battery when a trip exceeds 40 miles, and it’s rage on a full tank is around 400 miles.

Volt 42