article thumbnail

First 35 State plans to build out EV charging infrastructure approved; more than $900M in FY22 and FY23 funding

Green Car Congress

The Department of Transportation’s Federal Highway Administration (FHWA) announced the approval—ahead of schedule under the National Electric Vehicle Infrastructure (NEVI) Formula Program ( earlier post )—of 35 Electric Vehicle (EV) Infrastructure Deployment Plans from States, the District of Columbia and Puerto Rico.

article thumbnail

Study found highly elevated PM2.5 in pre-COVID-19 subway air in NE US; NYC the worst

Green Car Congress

concentrations and particle composition from area samples collected in the subways of Philadelphia, Pennsylvania; Boston, Massachusetts; New York City, New York/New Jersey (NYC/NJ); and Washington, District of Columbia. A team led by NYU Grossman School of Medicine researchers measured real-time and gravimetric PM 2.5

New York 418
article thumbnail

New UMTRI paper reviews major advantages and disadvantages of battery-electric and fuel-cell vehicles

Green Car Congress

For example, in the San Diego, California territory of SDG&E, optimal time of use residential EV charging rates range from $0.19/kWh However, the driving ranges of these vehicles are currently the lowest of any vehicle type, while also requiring the longest time to refuel or recharge. residential, commercial, office). kWh to $0.46/kWh

San Diego 150
article thumbnail

DOE to award $11M to 20 new Clean Cities projects for alt fuel cars and trucks

Green Car Congress

responder and vehicle maintenance technician training; develop. The Michigan Fuel Forward project will work with a wide range of partners. the District of Columbia, Maryland and northern Virginia will develop. The Southeast Regional Alternative Fuels Market Initiatives Program, which. Clean Energy. Greater Washington.

Clean 308
article thumbnail

How to Add EV Charging to an Apartment or Condo

EV Match

Some EV-popular states, such as California, District of Columbia, and Washington, have an EV market share of 18.32%, 12.7%, and 10.36%, respectively. The charging station will need to be connected to a local WiFi or a cellular network after installation, which is a task typically completed by the electrician or maintenance staff.