Remove Denver Remove Miles Remove Recharge Remove Solar
article thumbnail

Volvo teams with Starbucks to install EV charging network at U.S. locations

Teslarati

The charging stations, powered by ChargePoint, will be installed at up to 15 stores along a 1,350-miles corridor from Seattle to Denver. The charging locations will be separated by about 100 miles, a perfect distance for even the lowest-range EVs on the market.

Volvo 139
article thumbnail

Ford begins production of 2012 Focus Electric at Michigan Assembly, C-MAX models on deck

Green Car Congress

Ford’s Michigan Assembly Plant is starting production of the 2012 Focus Electric ( earlier post )—a five-passenger, battery-electric car Ford expects will achieve more than a 100 miles per gallon equivalent (MPGe) fuel economy rating. 1 gallon of gasoline=33.7 Phoenix and Tucson, Ariz.; Portland, Ore.; Raleigh-Durham, N.C.;

Michigan 363
article thumbnail

US DOE Awards $300 Million in Clean Cities Grants to Support Alternative Fuels, Vehicles, and Infrastructure Development

Green Car Congress

The program includes the installation of 10 alternative fuel refueling sites (two B20, one Electric Recharging, and seven CNG). The project includes 45 E85 and B20 stations, eight propane stations, and 132 electric vehicle recharging sites. Total DOE award: $15,000,000. Total DOE award: $12,975,388.

article thumbnail

More Electric Cars in Las Vegas with Stan Hanel's Story on the RAR'ster. with EVJerr Back to Webblogging, Sunday, 13 September 2009

Spirit of DC - PHEV3A

Mr. Moore made available his Papillion home’s historic dryer outlet as a recharging site when the roadtrip reached the vicinity of Omaha, Nebraska. Note: Recharging from a standard 110 VAC, 12-Amp source would take 27 to 30 hours to replenish the battery pack and significantly slow the progress of the roadtrip.

article thumbnail

Where Plug-In Hybrid Conversions (mostly Priuses) Are

Tony Karrer Delicious EVdriven

2006 (Denver CO) Veridian Corp. Mauro Rampini, 2004 Prius by Rampini Mauro, using EAA-PHEV method with components from Plugin Supply , May 10, 2008 (Arluno, Italy, EU), contact solare. South Coast Air Quality Management District #2 August 2006, by EnergyCS (Los Angeles County) State of Colorado Energy Office by Hybrids-Plus, Sept.

Prius 48