Remove Available Remove Charging Remove Light Remove Puerto Rico
article thumbnail

All US States, DC, Puerto Rico Get Green Light For EV Charging Plans

InsideEVs

Now that all charging infrastructure projects have been approved, reimbursement funds have been made available.

article thumbnail

BREAKING: Tesla Model 3 Highland goes live in North America

Teslarati

As of writing, the upgraded Model 3 is now available for order in the United States, Canada, Mexico, and Puerto Rico. These include the vehicle’s range, which reaches up to 341 miles per charge, and an updated exterior that’s optimized for maximum aerodynamics.

article thumbnail

Where to Start with EV Charging for Convenience Stores & Truck Stops

Blink Charging

Convenience stores and truck stops are in a fantastic position to take advantage of available federal funding for DC fast charging stations. Here’s what you need to know installing EV charging stations at your c-store or truck stop. Hosts can choose their preferred electrician or select one of Blink’s installation partners.

Store 95
article thumbnail

How did the National Electric Vehicle Infrastructure Program do in its first full year? – Charged EVs

Baua Electric

The National Electric Vehicle Infrastructure Program (NEVI), part of the Inflation Reduction Act, has made $5 billion in federal funding available to build public EV charging stations. – Charged EVs appeared first on Bauaelectric Auto News. Several states have had to push back their timelines.

article thumbnail

Three Major Sources of Funding for EV Charging at Convenience Stores and Truck Stops

Blink Charging

In the ongoing transition to electric vehicles (EVs), convenience stores and truck stops will continue to be important places for public EV charging. Businesses like convenience stores and truck stops are poised to take advantage of the current increase of EVs by installing public EV charging infrastructure. times more than in 2018.

Store 52
article thumbnail

Why the Next Microgrids Will Be Well Connected

Cars That Think

In September 2017 , Hurricane Maria devastated Puerto Rico. Several factors combine to make Puerto Rico an ideal place for solar power and microgrids. The group is a pioneer in bringing solar energy to Puerto Rico, having installed the first photovoltaic (PV) panels in Adjuntas in 1999.

article thumbnail

NREL study identifies nationwide charging needs; 28M charging ports by 2030 for 33M EV fleet

Green Car Congress

A new NREL study has estimated the number, type, and location of the charger infrastructure needed to support 30–42 million light-duty electric vehicles on the road by 2030. Now, NREL researchers have released The 2030 National Charging Network: Estimating U.S.

Charging 370