All US States, DC, Puerto Rico Get Green Light For EV Charging Plans
InsideEVs
SEPTEMBER 29, 2022
Now that all charging infrastructure projects have been approved, reimbursement funds have been made available.
InsideEVs
SEPTEMBER 29, 2022
Now that all charging infrastructure projects have been approved, reimbursement funds have been made available.
Teslarati
JANUARY 9, 2024
As of writing, the upgraded Model 3 is now available for order in the United States, Canada, Mexico, and Puerto Rico. These include the vehicle’s range, which reaches up to 341 miles per charge, and an updated exterior that’s optimized for maximum aerodynamics.
Blink Charging
OCTOBER 5, 2023
Convenience stores and truck stops are in a fantastic position to take advantage of available federal funding for DC fast charging stations. Here’s what you need to know installing EV charging stations at your c-store or truck stop. Hosts can choose their preferred electrician or select one of Blink’s installation partners.
Baua Electric
JANUARY 25, 2024
The National Electric Vehicle Infrastructure Program (NEVI), part of the Inflation Reduction Act, has made $5 billion in federal funding available to build public EV charging stations. – Charged EVs appeared first on Bauaelectric Auto News. Several states have had to push back their timelines.
Blink Charging
AUGUST 22, 2023
In the ongoing transition to electric vehicles (EVs), convenience stores and truck stops will continue to be important places for public EV charging. Businesses like convenience stores and truck stops are poised to take advantage of the current increase of EVs by installing public EV charging infrastructure. times more than in 2018.
Cars That Think
SEPTEMBER 16, 2023
In September 2017 , Hurricane Maria devastated Puerto Rico. Several factors combine to make Puerto Rico an ideal place for solar power and microgrids. The group is a pioneer in bringing solar energy to Puerto Rico, having installed the first photovoltaic (PV) panels in Adjuntas in 1999.
Green Car Congress
JUNE 28, 2023
A new NREL study has estimated the number, type, and location of the charger infrastructure needed to support 30–42 million light-duty electric vehicles on the road by 2030. Now, NREL researchers have released The 2030 National Charging Network: Estimating U.S.
Let's personalize your content