article thumbnail

Porsche is installing a solar panel microgrid, reducing CO2 emissions by an estimated 3.2 million lbs. per year

Electrek

Porsche is announcing today a new partnership with Cherry Street Energy to build a microgrid solar panel microgrid at One Porsche Drive in Atlanta. The post Porsche is installing a solar panel microgrid, reducing CO2 emissions by an estimated 3.2 million lbs. per year appeared first on Electrek.

Porsche 98
article thumbnail

Porsche Cars NA providing three years of charging at Electrify America stations for Taycam

Green Car Congress

Porsche Cars North America (PCNA) has entered an agreement with Electrify America, LLC to provide the first all-electric Porsche, the Taycan, with three years of charging at Electrify America public stations across the country. In addition, Porsche US dealers will install their own fast-charge kiosks.

Porsche 220
article thumbnail

New Porsche Berlin-Adlershof center with 25m solar pylon and 800V 350 kW fast charging

Green Car Congress

Porsche opened its new technology center in Berlin-Adlershof. The new site features a 25-meter-high solar pylon that generates up to 30,000 kWh of electricity annually and covers the entire annual demand of the new Porsche Center. Liquid-cooled, 800V 350 kW fast-charging is also installed on the premises. Porsche solar pylon.

Porsche 150
article thumbnail

Punching above its weight

Electric Auto Association

And that includes Atlanta, which is 10 times larger than Asheville.” If you want to have an in-depth discussion about EVs, solar installation, or anything environmental, you don’t need the usual 5-minute pre-conversation. Erb in the Porsche 914 EV conversion at EV races in Phoenix in 1998. Louis, and north of Florida.

article thumbnail

Waffle House hosts federal EV fast-chargers, bucks gas-station trend

Baua Electric

Installed by Atlanta-based charging infrastructure firm EnviroSpark, the new chargers are being hosted by a Waffle House restaurant in Lakeland, Tennessee. Porsche Taycan charging Tennessee documents show this location as costing $889,144, with $702,423 of it covered by the federal government.

Gas 52