Remove America Remove Connect Remove Installation Remove Portland
article thumbnail

TriMet puts first Xcelsior CHARGE electric bus into operation; powered by Portland General Electric renewable energy

Green Car Congress

New Flyer of America Inc. TriMet partnered with Portland General Electric (PGE) to purchase, own, and maintain six ABB chargers and the related infrastructure. TriMet is operating the forty-foot Xcelsior CHARGE bus on Line 62-Murray Blvd in the Portland, Oregon metro area.

Portland 246
article thumbnail

Electrify America to install 2,800 charging stations at workplaces and multi-unit dwellings across US

Green Car Congress

Electrify America LLC announced it will install more than 2,800 workplace and residential charging stations by June 2019 in 17 of the biggest metropolitan areas in the United States. Joining Electrify America in this initiative are SemaConnect, EV Connect and Greenlots. Earlier post.). Earlier post.).

article thumbnail

Electrify America releases $300M Cycle 2 national ZEV investment plan; metro charging, autonomous charging, renewable generation

Green Car Congress

Electrify America has released its National Zero Emissions Vehicle (ZEV) Investment Plan for Cycle 2; Cycle 2 is a 30-month investment period that begins in July 2019. Electrify America National Cycle 2 ZEV Investment Plan. Electrify America will continue to invest in educational efforts to increase consumers’ awareness of EVs.

America 290
article thumbnail

BMW’s ReachNow installing Light & Charge locations in Seattle; 100 chargers at 20 new public sites

Green Car Congress

ReachNow, the mobility services division of the BMW Group, Woodland Park Zoo, and the City of Seattle celebrated the successful installation of the first of 20 Light & Charge electric vehicle (EV) charging locations that will more than double the number of Fast Chargers publicly available in Seattle. million investment by the BMW Group.

Seattle 247
article thumbnail

BMW, Volkswagen and ChargePoint complete EV express charging corridors on the East and West Coasts

Green Car Congress

Electric vehicle (EV) drivers can now travel the most heavily-trafficked corridors on the East and West Coasts of the United States with the installation of 95 new DC Fast charging stations as part of the Express Charging Corridors Initiative—a collaboration of BMW of North America, Volkswagen of America, Inc.

BMW 150
article thumbnail

VW, BMW and ChargePoint partner to create SAE Combo DC fast charging corridors on the East and West Coasts

Green Car Congress

In the initial phase, the aim is to install nearly 100 DC Fast charging ports across both coasts, with plans to expand the program to increase access to fast charging across the country. The installations will occur both within and between relevant metro areas, strategically spaced at a maximum of 50 miles (80 km) apart.

DC 150
article thumbnail

Clearing the roadblocks to electrification of heavy-duty trucks

Charged EVs

When Charged first spoke with him in 2021, he was the Charging Infrastructure Lead at Daimler Trucks North America, and also the Chair of CharIN’s Megawatt Charging System (MCS) task force. He later served as Transportation Electrification Manager at Portland General Electric, so he’s worked both sides of the electric fence.

Fleet 52