Remove 2017 Remove Installation Remove San Jose Remove Taxi
article thumbnail

Electrify America releases $300M Cycle 2 national ZEV investment plan; metro charging, autonomous charging, renewable generation

Green Car Congress

These metro areas are expected to account for more than 50% of expected battery electric vehicles (BEVs) in operation outside California through 2022 (Navigant, 2017). Select DCFC stations also will be installed near multiunit dwellings (MUDs), expanding access to drivers who reside in apartment complexes and similar communities.

America 290
article thumbnail

CARB approves Electrify America’s second $200M investment in California

Green Car Congress

San Diego-Carlsbad. San Francisco-Oakland-Hayward. San Jose-Sunnyvale-Santa Clara. These metro areas are expected to account for 89% of battery electric vehicles (BEVs) in operation through 2022, according to a 2017 Navigant report. The cost of installation will be incorporated into a monthly fee.

article thumbnail

California ARB receives VW’s 1st $200M, 30-month ZEV investment plan

Green Car Congress

The Second California Partial Consent Decree would also require Volkswagen to pay ARB $25 million for ARB to spend on ZEV-related aspects of a vehicle replacement program in California in 2017 or later; and would require VW to pay about $41 million into the trust established under the 2.0 Green City.

article thumbnail

Electrify America announces $200M Cycle 2 zero emission vehicle investment plan for California

Green Car Congress

San Diego-Carlsbad. San Francisco-Oakland-Hayward. San Jose-Sunnyvale-Santa Clara. These metro areas are expected to account for 89% of expected battery electric vehicles (BEVs) in operation through 2022, according to a 2017 Navigant report. The cost of installation will be incorporated into a monthly fee.

America 239