Remove 2011 Remove Google Remove Grid Remove Stimulus
article thumbnail

Coming Soon – The Electric City

Revenge of the Electric Car

And at the headquarters of Pacific Gas and Electric, utility executives are preparing “heat maps” of neighborhoods that they fear may overload the power grid in their exuberance for electric cars.&#. And local electrical grids may need reinforcement. Here’s the full text of the entire article, in case the link goes bad: [link].

article thumbnail

Cleantech Blog: Smart Grids and Electric Vehicles

Tony Karrer Delicious EVdriven

The Three Prongs of the “Green&# Energy Stimulus Pa. Vehicle to Grid (V2G) technology is a bi-directional electric grid interface that allows a plug-in to take energy from the grid or put it back on the grid. The current electrical grid is poorly designed for distributed generation of power.

Grid 28
article thumbnail

Rapid Charging Electric Cars: How Fast, How Soon?

Tony Karrer Delicious EVdriven

Analysts Say No First Up for Google Ventures: Silver Spring’s Smart Grid » Comments & Trackbacks I don’t want to wait for my car to charge. Also hopefully by the end of 2011 (when the Model S car is due) our economy has recovered somewhat. Digg Stumble Reddit del.icio.us Email « Is It a Solar Bottom?