Remove Dealers Remove Recharge Remove Turkey Remove Volt
article thumbnail

Ford and Azure Dynamics to Collaborate on Transit Connect Electric for Europe

Green Car Congress

It will be rechargeable using standard European 220/240-volt outlets within 6 to 8 hours. Glider units, vehicles built without the powertrain, will be shipped from the current Ford Otosan manufacturing facility in Kocaeli, Turkey, directly to an Azure-contracted manufacturing location in Europe for final assembly.

article thumbnail

Electric Cars and a Smarter Grid - Green Inc. Blog - NYTimes.com

Tony Karrer Delicious EVdriven

A key thing, he said, will be to recharge the batteries at an acceptable time for the electricity grid — to “make sure people aren’t charging at the very peak, peak time,” like late afternoon when the electricity grid is already weighted down by demands like air conditioning. dealer network.

Grid 47