Remove Connected Remove Oregon Remove Plug Remove San Jose
article thumbnail

California Energy Commission to award $8.9M for completion of California DC fast charge North-South corridors

Green Car Congress

The California Energy Commission (CEC) has selected 8 awardees for a total of $8,875,457 in funding to install Direct Current (DC) fast charging stations on Interstate 5 (I-5), State Route 99 (SR 99), and along United States Highway 101 (US-101) from San Jose traveling South in California. I-5: Oregon Border to Red Bluff.

San Jose 150
article thumbnail

ICCT assesses factors driving EV market in US cities

Green Car Congress

Peter Slowik and Nic Lutsey analyze the connections among various state and local policies; public and workplace charging infrastructure; consumer incentives; model availability; and the share of new vehicles that are plug-in electric (both fully electric and plug-in hybrid).

Market 186
article thumbnail

Why NPR Hates Electric Cars - A Greenius Expose

Creative Greenius

The Focus is supposed to get 100 miles to a charge, but Frank is very worried about where people are going to plug in their cars. Frank didn’t mention anything about the different cities like Portland and San Jose to name a couple who are building the first wave of plug in infrastructure. Plugging Plug-Ins, Part I.

article thumbnail

Coming Soon – The Electric City

Revenge of the Electric Car

From the article: “The San Francisco building code will soon be revised to require that new structures be wired for car chargers. Across the street from City Hall, some drivers are already plugging converted hybrids into a row of charging stations. When the president of the California Public Utilities Commission, Michael R.

article thumbnail

The First Million-Transistor Chip: the Engineers’ Story

Cars That Think

He plugged not only the excitement of breaking the million-transistor barrier, but also his own philosophy of management: broadening the engineers’ outlook by challenging them outside their areas of expertise. A boundary scan feature lets system designers check the chip’s input and output connections without having to run instructions.

Engine 140