Remove Connect Remove Conversion Remove Convert Remove Ireland
article thumbnail

BT Group Converts Telecom Infrastructure to EV Chargers

Cars That Think

The first such conversion has already been completed in East Lothian, Scotland. BT Group says more cabinets in Scotland, England, Wales, and Northern Ireland will be repurposed in the coming months—as many as 600 such conversions by the end of 2024. BT Group’s design will allow each street cabinet to offer two 7.4-kilowatt

Convert 103
article thumbnail

Existing telecom infrastructure can put L2 charging everywhere, FAST

Baua Electric

The first such telecom cabinet-to-L2 charger conversion has already been completed in East Lothian, Scotland, and BT Group isn’t stopping there. kilowatt “Level 2” AC connections that will each provide a full charge in 6 to 8 hours. They’ve already done it! Why now Image by Robin Worrall; via Unsplash.

article thumbnail

Wind-to-Hydrogen Tech Goes to Sea

Cars That Think

Then, as now, wind farms are operating off the world’s coasts—but not all of these offshore sites are connected to the mainland via underwater power cables. They are highly automated production islands that directly convert wind energy to hydrogen, with a few of them processing the gas into fuels and other goods.

Wind 93
article thumbnail

Powering Offshore Wind Farms With Numerical Modeling of Subsea Cables

Cars That Think

The message above was sent through the first transatlantic telegraph cable between Newfoundland and Ireland, way back in 1858. Fast forward to 2014: The bottom of the ocean is home to nearly 300 communications cables, connecting countries and providing internet communications around the world.

Wind 76