Remove Chile Remove Commercial Remove Events Remove Installation
article thumbnail

A123 Systems to supply 20MW of Li-ion storage systems to AES Gener for spinning reserve project in Chile

Green Car Congress

AES Gener has ordered 20MW of A123’s advanced Li-ion energy storage solutions for a spinning reserve project in Northern Chile. The project expands the relationship between A123 and AES Energy Storage and is AES’ second in Chile to use A123 energy storage technology.

Chile 225
article thumbnail

AES integrates 20 MW of A123 Li-ion storage with 544 MW thermal power plant

Green Car Congress

AES Gener and AES Energy Storage have begun commercial operation of the second energy storage project in Northern Chile, integrating 20MW of Li-ion battery-based energy storage (BESS) with a 544MW thermal power plant. AES Energy Storage worked with AES Gener throughout the design, development, and installation of the Angamos BESS.

Li-ion 231
article thumbnail

China’s new energy buses are re-exported to Europe

Setec Powerr

He Yipeng, general manager of the commercial vehicle business center of BYD Europe Co., At the same time, sound-absorbing materials are installed in the interior, passenger doors, floors and other areas, which greatly improves the ride comfort. matching solutions.

Europe 40