Remove Building Remove Neighborhood Remove Power Grid Remove Solar
article thumbnail

Tesla’s solar neighborhood in Austin could help TX learn if renewables are viable

Teslarati

The project aims to build the first Tesla Solar neighborhood, making a sustainable residential community. The Tesla Solar neighborhood was provisionally named SunHouse at Easton Park. The solar and home battery units are integrated into the homes’ sale price as well, much like state-of-the-art appliances.

article thumbnail

3 Things Utilities Can Do to Prepare the Power Grid for More Electric Cars

EV Connect

Can the power grid actually handle that many electric cars? The capacity is there, but to truly handle this new surge in EV grid demand, it will take planning on the part of utility companies across the U.S. grid produced in 2020. Can the Power Grid Handle the Growing EV Demand? of what the U.S.

article thumbnail

What Is a Charge Point Operator (CPO)?

Driivz

A Charge Point Operator (CPO) is an eMobility industry player that builds EV charging sites, installs hardware from a variety of electric vehicle supply equipment (EVSE) vendors, and ensures optimal ongoing EV charging operations.

article thumbnail

NAATBatt Coalition recommends deployment of up to 300 GWh of distributed energy storage systems by 2022

Green Car Congress

DES systems consist of small, stationary batteries installed in neighborhoods, buildings, homes and electricity substations, which can be networked together using smart grid communications technology. The white paper points out that the way that DES systems are paid for discourages their deployment. value proposition.

article thumbnail

A Comprehensive Guide to EV Charging Management Software Solution

Driivz

Tools for Fleets and Commercial/Industrial Buildings – vertical-specific tools to manage and optimize EV charging for fleets and in commercial/industrial buildings. Installation can be costly, but dramatically speeds at-home EV charging time, depending on the exact charger model and local power grid access.

article thumbnail

Coming Soon – The Electric City

Revenge of the Electric Car

From the article: “The San Francisco building code will soon be revised to require that new structures be wired for car chargers. And at the headquarters of Pacific Gas and Electric, utility executives are preparing “heat maps” of neighborhoods that they fear may overload the power grid in their exuberance for electric cars.&#.

article thumbnail

Smart Meters and Electric Cars

Revenge of the Electric Car

The garage studies the integration of the electric vehicle into the power grid system where it either charges or discharges to accommodate the owner’s electricity needs. You have to build power plants to meet the peaks when every single air conditioner is going full blast.&#. Edison’s answer: new meters.